Responding 24 hours a day

Field Notes 007

Seguin: Caring for Heirlooms During a Pack-Out

For Seguin families, how heirlooms, photographs, and furniture are handled when belongings leave the home after water or fire damage.

Exhibit AField Notes / 007

Contents / Residential   Seguin  

When belongings leave a Seguin home after water or fire damage, heirlooms get the same careful process as everything else, with extra attention: each item is photographed, described, wrapped, tagged, and tracked to a location in climate-controlled storage until it comes home.

Tell us what matters

Before the pack-out begins, walk the house with your project contact and point out the pieces that matter most: family photographs, quilts, furniture, letters, collections. Those notes go into the inventory.

What stays with you

Irreplaceable small items such as jewelry, documents, and photo albums you want to keep close can stay with you. The inventory notes what you kept.

How items are handled

  • Each item is photographed and listed, with its condition.
  • Items are wrapped and labeled by room.
  • Belongings are kept in climate-controlled storage, organized by room.
  • Cleaning and deodorization are chosen item by item.

Separate line items

Pack-out, storage, cleaning, deodorization, furniture handling, and pack-back are each listed separately, so you and your adjuster can see what was done to which item. Read What a pack-out inventory includes.

111 Restoration in Seguin

This post is general information, not insurance or legal advice. Client names, photos, and identifying details are never published.

Open a file

Water or fire damage? Talk to a team member.

We respond 24 hours a day. Send the short form and a team member will call you back within 90 minutes. We come out, look at the damage, and give you an honest assessment. There is no pressure to sign anything on the first visit.

What goes in your file

  • 01An honest assessment. A team member looks at the damage in person and tells you plainly what we see and what we recommend.
  • 02A written scope before work starts. You know what we plan to do and why, and you can share it with your insurance company.
  • 03Photo and video documentation. Every affected area is recorded before, during, and after the work.
  • 04Moisture readings and drying records. Logged on each visit until materials reach their drying goals.
  • 05A room-by-room contents inventory. When contents are packed out, each item is listed, photographed, and tracked.
  • 06A closeout file. Photos, readings, inventory, scope, and the signed completion record in one place.

See our process

Intake sheetForm 111-A

Request a call back

Tell us where and what happened. Required fields are marked.

Send the form and a team member will call you back within 90 minutes. We use your details only to respond to this request. See our privacy notice.

Request a call back